ISTQB Paper 14

ISTQB Paper 14 Q1. Deliverables of test design phase include all the following except: a) Test data b) Test data plan c) Test summary report d) Test procedure plan Q2. Which of the following is not decided in the test-planning phase? a) Schedules and deliverables b) Hardware and software c) Entry and exit criteria d) […]

ISTQB questions 11

ISTQB Model Paper 1.Typical defects that are easier to find in reviews than in dynamic testing are: A. deviations from standards, B.requirement defects, C.design defects, D.insufficient maintainability and incorrect interface specifications. E.All of the above. 2.Reviews, static analysis and dynamic testing have the same objective – A.identifying defects. B. fixing defects. C. 1 and 2 […]

ISTQB Question Paper

ISTQB Question Paper 13 1 We split testing into distinct stages primarily because: a) Each test stage has a different purpose. b) It is easier to manage testing in stages. c) We can run different tests in different environments. d) The more stages we have, the better the testing. 2 Which of the following is […]

ISTQB dumps 12

 ISTQB Question Paper 12 Q1 A deviation from the specified or expected behaviour that is visible to end-users is called: a) an error b) a fault c) a failure d) a defect Q2 Regression testing should be performed: v) every week w) after the software has changed x) as often as possible y) when the […]

ISTQB Question Paper 9

ISTQB Question Paper 9 1. COTS is known as A. Commercial off the shelf software B. Compliance of the software C. Change control of the software D. Capable off the shelf software 2. From the below given choices, which one is the ‘Confidence testing’ A. Sanity testing B. System testing C. Smoke testing D. Regression […]

ISTQB Question Paper 8

ISTQB Question Paper 8 1. ___________ Testing will be performed by the people at client own locations A. Alpha testing B. Field testing C. Performance testing D. System testing 2. System testing should investigate A. Non-functional requirements only not Functional requirements B. Functional requirements only not non-functional requirements C. Non-functional requirements and Functional requirements D. […]

istqb foundation

ISTQB Question Paper 7 1 We split testing into distinct stages primarily because: a) Each test stage has a different purpose. b) It is easier to manage testing in stages. c) We can run different tests in different environments. d) The more stages we have, the better the testing. 2 Which of the following is […]

ISTQB Question Paper 10

ISTQB Question Paper 10 1 When what is visible to end-users is a deviation from the specific or expected behavior, this is called: a) an error b) a fault c) a failure d) a defect e) a mistake 2 Regression testing should be performed: v) every week w) after the software has changed x) as […]

istqb questions

ISTQB Question Paper 2 1) Which of the following is a major task of test planning? A Determining the test approach. B Preparing test specifications. C Evaluating exit criteria and reporting. D Measuring and analyzing results. 2) Which of the following statements is MOST OFTEN true? A Source-code inspections are often used in component testing. […]

istqb questions and answers

ISTQB Model Question Paper 3 1. Designing the test environment set-up and identifying any required infrastructure and tools are a part of which phase a) Test Implementation and execution b) Test Analysis and Design c) Evaluating the Exit Criteria and reporting d) Test Closure Activities 2. Test Implementation and execution has which of the following […]